Pushp Steels & Mining to set up integrated steel plant at Borai in Durg district of Chhattisgarh. The project involves expanding Integrated Special Steel Plant (0.40 MTPA) with Captive Power Plant (24 MW). The total project cost is estimated at Rs. 3800 million.
Following will be the break up of the plants and facilities to be installed:
S.N. |
Plant and facilities |
Capacity |
1 |
DRI Kiln |
2x350 TPD |
2 |
DRI Kiln |
1x500 TPD |
3 |
Induction Furnace |
4x15 Ton |
4 |
Induction Furnace |
4x12 Ton |
5 |
Ladle Furnace |
1x15 Ton |
6 |
Waste heat recovery boiler |
1x12 MW |
7 |
FBC Boiler |
1x12 MW |
8 |
Press Machine |
2x125 Ton |
9 |
Press Machine |
3x60 Ton |
10 |
Press Machine |
1x40Ton |
11 |
Press Machine |
2x25 Ton |
Integrated steel complex via DRI-IF-LRF-CCF route using its own captive power plant will be installed. Sponge Iron Plant, Captive Power Plant and automobile manufacturing facility will be provided. Billets will be manufactured via IF, LRF, continuous caste route and used for manufacturing automobile components. Coal will be beneficiated in a washery, which will be set up close to coal source to reduce ash. No sinter and pellet plant will be installed.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy