HEG to expand its steel plant at Rasmada village in Borai in Durg district of Chhattisgarh. The expansion details are as follows:-
S. N. |
Proposed units |
Existing Capacity (TPA) |
Expansion (TPA) |
Total Capacity after expansion (TPA) |
1. |
Sponge Iron |
1,20,000 |
4,80,000 |
6,00,000 |
2. |
Steel melting shop |
100,000 |
2,37,000 |
3,37,000 |
3. |
Power A. WHRB B. AFBC |
12.8 MW |
75 MW 25 MW 50 MW |
87.8 MW |
4 |
Coal washery |
-- |
10,00,000 |
10,00,000 |
5 |
Pellet plant |
-- |
10,00,000 |
10,00,000 |
6 |
Rolling mill |
-- |
1,60,000 |
1,60,000 |
7 |
Ferro alloy
A. Ferro Chrome B. Ferro Manganese C. Ferro Silicon D. Silico Manganese
|
--
-- -- -- -- |
82,130
23,100 28,050 9,530 21,450 |
82,130
23,100 28,050 9,530 21,450 |
N.R. Ispat & Power to set up integrated steel plant at Gourmudi in Gerwani Tehsil in Raigarh district of Chhattisgarh. The project involves setting up of Integrated Steel plant (Sponge Iron, 60,000 TPA, Ingots / Billets, 60,000 TPA; Rolled products, 60,000 TPA, Power Plant (WHRB 4 MW & FBC 10 MW). Further details are as follows:-
S.N. |
Details |
Proposed Plant configuration |
Proposed capacity |
1 |
Manufacturing of Sponge Iron through DRI Route |
2x100 TPD |
60,000 TPA |
2 |
Manufacturing of Steel Ingots / Billets through Induction Furnace` |
2x10 MT/ heat |
60,000 TPA |
3 |
Manufacturing of Rolled products (Structural Items) through Automatic Rolling Mill |
1x200 TPD |
60,000 TPA |
4 |
Power Plant (WHRB) |
1x4 MW |
4 MW |
5 |
Power Plant (FBC) |
1x10 MW |
10 MW |
SKS Ispat and Power to expand steel plant at Siltara in Raipur district of Chhattisgarh. The project involves setting up of the following facilities.
S.N. |
Production facilities |
Phase-I |
Phase-II |
Phase-III |
1 |
BF |
- |
- |
550 m3 |
2 |
Sinter Plant |
- |
- |
75 m2 |
3 |
Palletizing Plant |
- |
- |
0.6 MTPA |
4 |
Power Plant* |
- |
- |
2x30 MW |
5 |
SMS with EAF, LF, VD Billet Bloom casters 1x25 caster |
- |
- |
25 MW ? WHRB |
6 |
Ferro Alloy Plant |
- |
- |
2x9 MVA |
7 |
Wire rods and Bar Mill |
- |
- |
3,00,000 TPA each |
8 |
Oxygen Plant |
- |
- |
-- |
9 |
Sponge Iron Plant* |
2x100 TPD 2x350 TPD |
- |
2x500 TPD DRI |
10 |
Coke oven battery (Non-recovery) |
|
- |
0.5 MTPA |
11 |
Induction Furnace |
4x12 T) |
- |
4x15 Tons |
12 |
Heavy structural roll |
1 (500 TPD) |
- |
|
13 |
Light structural roll |
1 (200 TPD) |
- |
|
to manufacture the following products.
S.N. |
Products |
Phase-I (TPA) |
Phase-II (TPA) |
Phase-III (TPA) |
1 |
Sponge Iron |
2,70,000 |
-- |
3,00,000 |
2 |
Steel Blooms Steel Billets |
2,31,000 |
-- |
-- |
3 |
Steel structure |
2,24,000 |
-- |
-- |
4 |
TMT Bars |
-- |
2,00,000 |
-- |
5 |
Wire rods |
-- |
-- |
3,00,000 |
6 |
Alloy steel |
-- |
-- |
3,00,000 |
7 |
Coal washery |
-- |
2,00,000 |
-- |
8 |
Coke Oven |
-- |
-- |
5,00,000 |
9 |
Power Plant |
25 MW |
-- |
-- |
10 |
Mini Blast Furnace |
-- |
-- |
4,12,500 |
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy